Christ Church Undercroft Works
|
Week Four lst June 2004 |
|||||
|
This is half-term week and the pre-school nursery is closed. It has been arranged that the drainage channnel will be dug between the church and hall at this time. |
|||||
|
|
Here the ditch is being dug for the pipework to the undercroft toilet. A large hole has also been dug to house the pumping station. This will be delivered shortly. |
|
|
||
|
|
|
|
|
||
|
|
|
Meanwhile, excavation is still continuing under the church. The doorway between the new large meeting room and the lobby leading to the toilet can be seen. All three meeting rooms are now connected. |
|
||
|
|
|||||