Christ Church Undercroft Works

Week Three 24th May 2004

---

A steel "Picture Frame" roof support is installed to replace the old Choir Vestry wall. The excavator is now able to enter the undercroft and start to remove rubble and soil.

A dumper truck moves pieces of the heavy steel "picture frame" from the delivery lorry to the undercroft.

Our builders install the supports and secure them in place.

 

 

 

 

The excavator moves under the church and begins to dig out and remove the soil to make a level floor for the extended meeting room.

A grab lorry arrives to take away some of the rubble and soil.

 

 

Home Page Next Page Previous Page

 Transit Management | Business Travel | Flights North CyprusCheap Car Rental | Car Hire USA | Car Hire Canada | Car Hire Portugal