Christ Church Undercroft Works
|
Week Fourteen 9th August 2004 |
|||||
|
The new windows are installed in Meeting Rooms One and Two. The first pieces of plasterboard are put on the walls. |
|||||
|
|
The windows are double glazed and made of tough polycarbonate sheeting. They can be opened to provide ventilation. |
|
With most of the electrical cables in place, plaster board fitting can begin. |
||
|
|
|
|
|
||
|
|
|
The floor area of the lobby has a raised floor giving level access to the disabled toilet from large Meeting Room Two. |
|
||
|
|
|||||