Week Thirteen 2nd August 2004 |
|||||
|
Carpenters work on door frames and prepare ceiling area. In the grounds, the paths are surfaced and the builders spoil is removed so grass re-seeding can take place. |
|||||
|
|
The ceilings are covered with wooden batons. Electrical cables and conduits are in place. |
|
Carpenters have constructed door frames which are stored until needed. |
||
|
|
|
|
|
||
|
|
|
In the grounds, the paths now have a tarmac surface. Piles of spoil have been removed and new grass seed has been planted. Good growing weather is needed. |
|
||
|
|
|||||